Is this investment worth it?
Buying equipment, launching a product, hiring a team, opening a location: every investment trades money now for money later. The hard part is that money later is worth less than money now, because today's dollar could be earning a return elsewhere. Net present value (NPV) and the internal rate of return (IRR) are the standard tools for making that comparison fairly.
Enter the upfront investment, the cash you expect each period and your discount rate, and this calculator gives you NPV, IRR, the simple and discounted payback periods and the profitability index, with a table showing how each cash flow is discounted.
What each number means
- NPV is the value of all future cash flows in today's money, minus the investment. Positive NPV means the project earns more than your required return; negative means it earns less.
- IRR is the discount rate at which NPV is exactly zero: the project's own rate of return. If IRR beats your required return (the "hurdle rate"), the project clears the bar.
- Payback period is how long until cumulative cash flows repay the investment. It's simple and intuitive but ignores the time value of money and anything after payback.
- Discounted payback does the same using discounted cash flows, so it's always longer than simple payback.
- Profitability index is the present value of future cash flows divided by the investment. Above 1 means value is created; it's handy for ranking projects when money is limited.
The formulas
NPV = −investment + Σ cash flowₜ ÷ (1 + r)ᵗ for t = 1 … n
IRR = the rate r at which NPV = 0
Payback = years before the last negative cumulative + (remaining amount ÷ next year's cash flow)
Profitability index = Σ cash flowₜ ÷ (1 + r)ᵗ ÷ investment
Worked example
A business is considering an $80,000 machine expected to bring in $18,000, $24,000, $28,000, $30,000 and $26,000 over five years. Its required return is 10%.
- Present value of the cash flows ≈ $93,870
- NPV ≈ $93,870 − $80,000 = about $13,870
- IRR ≈ 16.1%, comfortably above the 10% hurdle
- Payback ≈ 3.3 years; discounted payback ≈ 4.1 years
- Profitability index ≈ 1.17
On these numbers, the machine is worth buying. The table under the calculator shows each year's cash flow, its discounted value and the running total, so you can see exactly when the investment turns positive in today's money.
Choosing a discount rate
The discount rate is the return you could earn elsewhere at similar risk. Companies often use their weighted average cost of capital (WACC). Small businesses might use the interest rate on their loans, or a higher rate for riskier projects. Because NPV can swing a lot with the rate, it's worth trying a few: if a project only works at a low discount rate, it's fragile.
NPV vs IRR: which to trust?
Usually they agree. When they don't, for example when comparing projects of very different sizes, NPV is the better guide because it measures value in dollars. IRR can also be misleading when cash flows switch between positive and negative more than once, which can produce more than one IRR or none at all. The calculator tells you when there's no single IRR.
Common mistakes
- Optimistic cash flows. NPV is only as good as the forecast behind it. Test a pessimistic case too; my guide to forecasting sales covers building honest forecasts.
- Forgetting later costs like maintenance, upgrades or the money tied up in stock.
- Mixing time units. If cash flows are monthly, use a monthly discount rate.
- Relying on payback alone. A project with fast payback can still have a lower NPV than one that pays back slowly but earns much more later.
For long-run growth rates rather than investment returns, see the CAGR calculator, and to judge marketing spend specifically, the LTV:CAC calculator.
Questions
What is a good IRR?
Any IRR above your cost of capital or required return creates value. What counts as good depends on risk: a safe project can be worthwhile at a modest IRR, while a risky one should clear a much higher bar.
Can NPV be negative even if the project makes money?
Yes. A project can return more cash than it costs and still have negative NPV if those returns arrive too slowly to beat your required return.
What's the Excel formula for NPV and IRR?
Use =NPV(rate, cash flows from year 1) − investment and =IRR(range including the negative investment). Note that Excel's NPV assumes the first cash flow comes one period from now, so the investment is subtracted separately.
Is this financial advice?
No. It's an educational calculator. Results depend entirely on your assumptions; check important decisions with a qualified professional.